Abstract
Measurements obtained from lateral total stress sensors located on the centre pile of a small driven pile group and pneumatic piezometers installed in the vicinity of the group are used to assess the disturbance associated with installation of driven piles in a clayey silt. The observations made are substantiated in a subsequent load test on one pile in the group.
| Original language | English (Ireland) |
|---|---|
| Title of host publication | 13th International Conference in Soil Mechanics and Geotechnical Engineering (ICSMGE) |
| Place of Publication | Prague |
| Publisher | National University of Ireland, Galway |
| DOIs | |
| Publication status | Published - 1 Jan 2003 |
Keywords
- equalization
- installation
- instrumentation
- Pile group
Fingerprint
Dive into the research topics of 'Stress changes associated with driving pile groups in clayey silt.'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver