Project failure en masse: a study of loose budgetary control in ISD projects: A study of loose budgetary control in ISD projects

Research output: Contribution to a Journal (Peer & Non Peer)Articlepeer-review

55 Citations (Scopus)

Abstract

This paper investigates the tightness of budgetary control over projects in a large systems development multinational. This represents a case of extreme information systems development (ISD) failure en masse, where all but two of the 22 projects in a business unit went over budget, causing senior executives to refocus their strategic priorities and cancel all current and potential projects that followed. This study focuses specifically on the two best performing (12 and 4% under budget) and worst performing (223 and 320% over budget) of these projects. Using a framework drawn from control systems theory, this study examines the tightness of budgetary control exerted over each project, and what was done or could have been done to avert such failure. The study then identifies a set of emerging factors affecting tight budgetary control in ISD. European Journal of Information Systems (2010) 19, 273-287. doi:10.1057 ejis.2010.7; published online 18 May 2010
Original languageEnglish (Ireland)
Pages (from-to)273-287
Number of pages15
JournalEuropean Journal Of Information Systems
Volume19
Issue number3
DOIs
Publication statusPublished - 1 Jun 2010

Keywords

  • Budgeting
  • Control
  • Project management
  • System development

Authors (Note for portal: view the doc link for the full list of authors)

  • Authors
  • Conboy, K

Fingerprint

Dive into the research topics of 'Project failure en masse: a study of loose budgetary control in ISD projects: A study of loose budgetary control in ISD projects'. Together they form a unique fingerprint.

Cite this